silvrzuki77
Well-Known Member
- Messages
- 556
- Location
- Vegas
Hey guys, little update now. I am going a little slow tryin to do it right. Anyways finished up the bolt on water tank support. Need to add a aluminum skid plate to it. Here is the support sitting upside down.
I also cut holes in the crossmembers and added tubing and welded them in as a utility chase for my water lines not to hang down.
Next step is the tongue, build a set off shackles and tie down points for the floor. Once i get the prototype frame brackets for my h3t sliders ill make tube fenders for the trailer so i can bend all the steel at one time.
I also cut holes in the crossmembers and added tubing and welded them in as a utility chase for my water lines not to hang down.
Next step is the tongue, build a set off shackles and tie down points for the floor. Once i get the prototype frame brackets for my h3t sliders ill make tube fenders for the trailer so i can bend all the steel at one time.